Preparation of Safety Case for LPG Storage and Distribution Depot

- Client Elgas Ltd
- Location Lytton, Queensland
Project challenge
Key benefits for the client
Key issues
- Facility was previously was not a MHF
- SMS needed significant revision to meet MHF regulatory standards
- A time frame needed to be developed for completing outstanding risk reduction actions to demonstrate SFAIRP
- A number of clarifications required by regulator on the Safety Case submitted needed to be responded to within the time frame specified
How Arriscar helped the client
- Conducted additional workshops to address issues raised by regulator
- Conducted a QRA of the site
- Developed Bow-Ties for Major Incidents
- Followed up and provided further clarifications to client for submission to regulator