Safety Studies for Nong Yao Facilities
- Client Thai Nippon Steel
- Location Gulf of Thailand
- Operator Mubadala Petroleum
- Team Raghu Raman, John Paul Maiorana, Philip Skinner
- Project Duration 3 Months
Project challenge
Key benefits for the client
Key issues
- Manning levels
- Crew Transfers
- Fire wall ratings with respect to EER Goals
- Blast wall ratings
- Fire and Gas Detection layout optimisation
How Arriscar helped the client
- Fire and Explosion Risk Analysis: including CFD explosion modelling
- Passive Fire Protection Study
- 3D Fire and Gas Mapping Study
- Dropped Object Risk Analysis
- Ship Collision Study
- Escape, Evacuation Rescue Analysis
- Emergency Systems Survivability Analysis
- Gas Dispersion and Smoke Ingress Analysis
- Quantitative Risk Analysis
- Thermal Plume and Vent Study (CFD)